BT10 series is the long life IP65 Outdoor LED Linear light suitable for Tunnel project, Performance Venue, Badminton Hall, Parking, Factory, Warehouse, etc.
①Tempered glass surface maintain the luminous surface clean and high light pass rate
②Anti-glare coating on glass makes light reflect as diffuse rather than direct
③Movable bracket allows arbitrary spacing installation, flexible adjustment
④Breathing valve helps to pervent fogging inside the lamp
⑤Linear arrangement of lamps creates comfortable luminous zone
Voltage Range | 110-277 V |
Electrical Frequency | 50/60 Hz |
Power Factor | >0.95 |
Color Temp | 2700K~6500K |
Trust By:
OUTDOOR LED LINEAR LIGHT FOR TUNNEL PROJECT IP65 LONG LIFE
PARAMETER | |
Voltage Range | 110-277 V |
Electrical Frequency | 50/60 Hz |
Power Factor | >0.95 |
Color Temp | 2700K~6500K |
CRI | >70 |
Beam Angle | 120° |
Dimming Mode | 0-10V |
Operating Temp | ‘-20~ +50°C |
Installation Mode | Bracket mounting |
IP class | IP65 |
Impact Resistance | IK08 |
Surge Protection | 10KV |
Flux maintenancehour @100000hour | Based on IES TM-21, L70 (12K)≥72000 hours |
Housing Material | Aluminium Profile |
Finish color | White/Gray/Customize |
Model | Power | Voltage range | Luminous efficiency |
BT10-50W | 50W | 110-277 V | 90-110 lm/W |
BT10-100W | 100W | 110-277 V | 90-110 lm/W |
BT10-150W | 150W | 110-277 V | 90-110 lm/W |
BT10-200W | 200W | 110-277 V | 90-110 lm/W |
BT10-240W | 240W | 110-277 V | 90-110 lm/W |
Related Products
How to Custom Baldrtek LED Lighting ?
Just 4 Easy Steps to Start Your Project
Tell Us What You Need
Please send us the drawing, reference pictures, or share your idea. Advise the required quantity and lead time. Then, we will work on it.
Review the Quotation & Solution
According to your requirements, Our Sales team will get back to you within 24 hours with the best suit solution and competitive quote.
Getting Prototyping and Adjustment
After approving the quote, we will prepare the prototyping sample for you in 3-5 days. You can confirm this by physical sample or picture & video.
Approval for Bulk Production & Shipping
Mass production will start after approving the prototype. Normally it will take 10 to 15 working days depending on the order quantity and complexity of the project.
Ask For Quote
Frequently Asked Questions
For contractor partner, we offer DIALux Report for the project and LED product in complete.
For local lighting manufacturer partners, we offer measured product data including IES and product in SKD form.
Samples take 4-10 days and mass production takes 2-5 weeks, depending on the order quantity.
For regular products, Baldrtek can guarantee shortest lead time to be 7 days.
Yes, one sample is available for inspection and we don’t have strict requirement on minunum order quantity for mass production.
Normally order quantity will be based on project requirement, we apply MTO strategy and open for order quantity.
We have been cooperating with transportation companies for 5 years. We can complete transportation for you by ship, railway or air. Generally, air transportation is fast, and the transportation time is only 7-10 days. If you choose to transport by ship, the transportation time may take 30-60 days, but the cost of ship transportation will be lower.
We make production based on the confirmed sample, and will keep everything same as samples as possilbe, unless with customer further approvel, we don’t make change.
During sourcing and production process, we are rigorous in the QC checking process.
After production finished, we will test on the over-all batch of products.