BS39 series is the long life IP66 LED street light suitable for road lighting projects, including 6m-15m expressways, urban expressways, first, second and third class highways, etc.
① The streamline lamp body is keeping away the snow in winter or the dust in summer, contributing to good heat dissipation.
② Tempered glass surface helps to maintain the luminous surface clean and light pass maintenance rate high.
③ Various PC lens available for different light distribution requirements: highways, urban expressways, etc.
④ The installation elevation angle can be adjusted flexibly adapt to different scenarios.
Voltage Range | AC 110-277 V |
Electrical Frequency | 50/60 Hz |
Power Factor | >0.95 |
Color Temp | 2700K~6500K |
CRI | >70 |
Trust By:
DIE-CASTING LED STREET LIGHT FOR OUTDOOR PROJECT IP66 LONG LIFE-BS39
PARAMETER | |
Voltage Range | AC 110-277 V |
Electrical Frequency | 50/60 Hz |
Power Factor | >0.95 |
Color Temp | 2700K~6500K |
CRI | >70 |
Beam Angle | Type I/Type II/ Type III/ Type IV |
Dimming Mode | 0-10V |
Operating Temperature | ‘-20~ +50°C |
Installation Mode | Cantilever mounting |
IP Class | IP66 |
Impact Resistance | IK08 |
Surge Protection | 10KV |
Flux Maintenance Hour @100000hour | Based on IES TM-21, L70 (12K)≥72000 hours |
Lamp Material | ADC 12 Die-cast aluminum |
Lens Material | Polycarbonate |
Lamp Housing Color | Black/Gray/Customize |
Model | Power | Voltage Range | Luminous Efficiency |
B39-30W | 30W | 110-277 V | 120-150 lm/W |
B39-50W | 50W | 110-277 V | 120-150 lm/W |
B39-100W | 100W | 110-277 V | 120-150 lm/W |
B39-150W | 150W | 110-277 V | 120-150 lm/W |
B39-200W | 200W | 110-277 V | 120-150 lm/W |
B39-240W | 240W | 110-277 V | 120-150 lm/W |
B39-300W | 300W | 110-277 V | 120-150 lm/W |
Graphic display diagram:
Related Products
How to CustomBaldrtek LED Lighting?
Just 4 Easy Steps to Start Your Project
Tell Us What You Need
Please send us the drawing, reference pictures, or share your idea. Advise the required quantity and lead time. Then, we will work on it.
Review the Quotation & Solution
According to your requirements, Our Sales team will get back to you within 24 hours with the best suit solution and competitive quote.
Getting Prototyping and Adjustment
After approving the quote, we will prepare the prototyping sample for you in 3-5 days. You can confirm this by physical sample or picture & video.
Approval for Bulk Production & Shipping
Mass production will start after approving the prototype. Normally it will take 10 to 15 working days depending on the order quantity and complexity of the project.
Ask For Quote
Frequently Asked Questions
For contractor partner, we offer DIALux Report for the project and LED product in complete.
For local lighting manufacturer partners, we offer measured product data including IES and product in SKD form.
Samples take 4-10 days and mass production takes 2-5 weeks, depending on the order quantity.
For regular products, Baldrtek can guarantee shortest lead time to be 7 days.
Yes, one sample is available for inspection and we don’t have strict requirement on minunum order quantity for mass production.
Normally order quantity will be based on project requirement, we apply MTO strategy and open for order quantity.
We have been cooperating with transportation companies for 5 years. We can complete transportation for you by ship, railway or air. Generally, air transportation is fast, and the transportation time is only 7-10 days. If you choose to transport by ship, the transportation time may take 30-60 days, but the cost of ship transportation will be lower.
We make production based on the confirmed sample, and will keep everything same as samples as possilbe, unless with customer further approvel, we don’t make change.
During sourcing and production process, we are rigorous in the QC checking process.
After production finished, we will test on the over-all batch of products.